The removal, refitting and re-welding of three low Voltage IPB’s for Centrica had to be completed to allow the replacement of defective low voltage bushings within a 145MVA power transformer
TP Power Services picked by BP to complete the rewind of the main drilling transformer on their BP harding platform in the North Sea.
T.P Power Services has worked on wind farm projects for energy providers, providing a number of services for power distribution and connections to the national grid. One such project was the full installation of three 120MVA transformers at Whitelee in Scotland, where the 5500 hectare, 140 turbine site will become the LARGEST in EUROPE upon its completion in the middle of 2009.
Working with CRE Energy, Balfour Kilpatrick and Morrison Construction on the Whitelee site near Glasgow, launched T.P. Power Services into renewable energy where we continue to invest more of our resources.
Our fully trained and experienced team of electrical design, project, installation and service engineers make us one of the few companies able to connect a wind farms 35kV to the 400kV of the national grid. We provide a full design, manufacture and installation service for wind farm substations; including transformers, switchgear, control systems, cable infrastructure and earthing systems.