The removal, refitting and re-welding of three low Voltage IPB’s for Centrica had to be completed to allow the replacement of defective low voltage bushings within a 145MVA power transformer
TP Power Services picked by BP to complete the rewind of the main drilling transformer on their BP harding platform in the North Sea.