The removal, refitting and re-welding of three low Voltage IPB’s for Centrica had to be completed to allow the replacement of defective low voltage bushings within a 145MVA power transformer
TP Power Services picked by BP to complete the rewind of the main drilling transformer on their BP harding platform in the North Sea.
Posted on: 14 October 2009
The removal, refitting and re-welding of three low Voltage IPB’s for Centrica had to be completed to allow the replacement of defective low voltage bushings within a 145MVA power transformer
Posted on: 7 October 2009
TP Power Services picked by BP to complete the rewind of the main drilling transformer on their BP harding platform in the North Sea.
Posted on: 15 May 2009
TPPS are delivering their services offshore for the installation, modification and commissioning of cast resin transformers for one of Centrica Storage’s offshore platforms
Posted on: 15 May 2009
TPPS successful in their tender for the installation of the Power Transformers at E.ON's Isle of Grain CHP.
Posted on: 15 May 2009
TP Power Services Ltd contracted to install the main transformers on RWE’s Staythorpe ‘C’ Power Station.
Posted on: 16 October 2008
TPPS contracted to design and manufacture two directly interchangeable transformers for BE’s Dungeness B Nuclear Power Station site.
Posted on: 16 October 2008
Global power operator Intergen subcontracts TP Power Services head project manager as a consultant when a 310MVA Generator transformer malfunctions.
Posted on: 10 October 2008
Contracted for the receipt, assembly, installation and testing of eight transformers from 5MVA to 415MVA at Centrica's Langage Power Station near Plymouth.
Posted on: 23 September 2008
Maintenance and refurbishment of a 132kV and smaller transformers for Centrica PB limited.
Posted on: 19 September 2008
The electrical breakdown of a 32kV transformer requiring de-tanking, inspection, rewind and testing on a premium rate rewind package.